nkysdb: 共著者関連データベース
BYRNE T. 様の 共著関連データベース
+(A list of literatures under single or joint authorship with "BYRNE T.")
共著回数と共著者名 (a list of the joint author(s))
9: BYRNE T.
4: KARIG D., MALTMAN A., TAIRA A.
3: HILL I., LALLEMANT S.
2: ARAKI E., BERNER U., BRUCKMANN W., EGUCHI N., FIRTH J., FISHER A., FOUCHER J.-P., GAMO T., GIESKES J., KASTNER M., KATO Y., LU R., MCNEILL L., MOORE G., MORAN K., PICKERING K., SIENA F., Shipboard Scientific Party, TAYLOR E., TOCZKO S., YAMANO M., ZHANG J.
1: BOUTT D., Brown University, CHABEMAUD T., CHABERNAUD T., CONIN M., DITULLIO L., DOAN M.-L., Expedition 319 Scientists, FLEMINGS P.B., HENRY P., HYNDMAN R., HYNDMAN T., ITO T., KANO Y., LALLEMANT S.J., LIN W., ODP Leg131乗船研究員, OLAFFSON G., OLAFSSON G., ORR R., OWENS B., OWENS W., Providence RI, SAFFER D., SAFFER D.M., TAKAHASHI K., TORIUMI M., UNDERWOOD M., UNDERWOOK M., WILKENSON C., WILKINSON C., WINTSCH R.P., 平 朝彦, 徐 垣, 河野 敦, 芦 寿一郎
発行年とタイトル (Title and year of the issue(s))
1990: Bulk Mineralogy, Clay Mineralogy, and Diagenesis of Sediments Cored at ODP Site 808, Nankai Trough Accretionary Prism (T41D 5)
1990: Evidence for Changing Plate Motions in the Eocene Shimanto Belt, Southwest Japan (S42A 11)
1990: ODP Leg131南海トラフより採取された堆積物のCTスキャン像
Computed Tomogram of the Sediment Samples Obtained from Nankai Trough, ODP Leg 131
1990: Structural Geology of the Nankai Accretionary Prism, Evidence from ODP Leg 131 (T41D 3)
1992: Sediment deformation and hydrogeology of the Nankai Trough accretionary prism: Synthesis of shipboard results of ODP Leg 131
1993: Stress Tensors at the Toe of the Nankai Accretionary Prism: an Application of Inverse Methods to Slickenlined Faults
1999: Exhumation of the Sanbagawa blueschist belt, SW Japan, by lateral flow and extrusion: evidence from structural kinematics and retrograde P T t paths
2010: Expedition 319 of the riser drilling platform from and to Shingu, Japan Sites C0009 C0011 5 May 31 August 2009
2013: In situ stress and pore pressure in the Kumano Forearc Basin, offshore SW Honshu from downhole measurements during riser drilling