Asia Pacific Metrology Programme
Technical Committee for Electricity and Magnetism
APMP-TCEM
Document Archives
link to Useful Document Library
@
APMP_Comparison_Form_(Past_Comparisons)2 Declaration forms of the past APMP comparisons
APMP_EC_20-2 APMP time table for the end of transition period of the CIPM-MRA [QS] | APMP GA 18-6 | APMP EC 20-2 |
APMP EC 22-1 APMP Guidelines for acceptance of data for Appendix C DOC20020720 | APMP-G3 | APMP EC 22-1 |
APMP EC 22-2 [replaced by | TCChairs_1-2/2 | APMP-G1_v2 |] APMP Procedure for CMC entry in Appendix C | DOC20001210 | APMP EC 22-2 | APMP G1 |
APMP EC 22-3 * [Established] Criteria for acceptance of data for Appendix C | JCRB-13/06(2) | APMP TCChairs 1-2/5 | APMP EC 22-3 | TCEM 5-5 | APMP G1 | JCRB-8/13(1b) | JCRB-7/1 #2|
APMP EC 22-4 JCRB Rules of Procedure for CMC entry into Appendix C | JCRB-13/06 | APMP TCChairs 1-2/6 | APMP EC 22-4 | TCEM 5-5 | APMP G1 | JCRB-7/1 |
APMP EC 22-5 [confidential] JCRB Guidelines for the monitoring and reporting of the operation of Quality Systems by RMOs (with suggested APMP amendments) | JCRB-9/10(1)_rev with APMP comments DR2 |
APMP EC 22-6 APMP criteria for accepting a quality system | DOC20030120B | APMP EC 22-6 |
APMP EC 22-7
Quality
System Questionnaire QS1 (2003-02-10 draft 2003-01-31)
| APMP EC 22-7 | TCQS-WG1_1 |
APMP EC 22-8 [confidential] End of transition period of CIPM MRA - review of published CMCs | JCRB-9/12 revised 4 October 2002 |
APMP EC 22-9 Actions arising from the 18th GA
APMP EC 22-10 (Project seeking APEC funding) International Comparisons of Metrology Standards Between NMIs in Developing Economies
APMP EC 22-11 (APEC Project CTI 23/2003T) A Joint APMP-SIM Workshop Addressing the Implementation of Quality Systems in National Metrology Institutes
APMP EC 22-12 (Report of Activities in APEC-TILF funding project of CTI 11/2002T) "Peer Review and Its Criteria of Quality System in National Metrology Institutes" reported by SETA Katuo, APMP secretariat
APMP EC 22-13 (APMP-TCEM) "Report to the JCRB on NIMT CMC submission" by Chua Sze Wey
APMP EC 22-15 APMP QS Review Process
APMP EC 22-16 TCQS Review Report
APMP EC 22-17 (tentative translation) National metrological system development act (of Thailand)
APMP EC 22-18 Ad-hoc discussion for the representative for capacitance from Thailand (NIMT and TISTR)
APMP G1 JCRB Rules of Procedure for CMC entry into Appendix C | JCRB-13/06 | APMP TCChairs 1-2/6 | APMP EC 22-4 | TCEM 5-5 | APMP G1 | JCRB-7/1 |
APMP G1 * [Established] Criteria for acceptance of data for Appendix C | JCRB-13/06(2) | APMP TCChairs 1-2/5 | APMP EC 22-3 | TCEM 5-5 | APMP G1 | JCRB-8/13(1b) | JCRB-7/1 #2|
APMP G1 * Procedure for inter-regional review of CMCs | TCEM 5-5 | APMP G1 | JCRB-7/1 #3|
APMP G1 [replaced by | TCChairs_1-2/2 | APMP-G1_v2 |] APMP Procedure for CMC entry in Appendix C | DOC20001210 | APMP EC 22-2 | APMP G1 |
APMP-G1rev APMP Procedure for CMC entry in Appendix C (G-1 ver.2) | APMP-G1rev |
APMP-G2(draft) The APMP Guidelines on conducting comparisons (draft) | APMP-G2(draft) |
APMP-G2 The APMP Guidelines on conducting comparisons | APMP-G2 |
APMP-G3 APMP Guidelines for acceptance of data for Appendix C DOC20020720 | APMP-G3 | APMP EC 22-1 |
APMP_GA_18-6 APMP time table for the end of transition period of the CIPM-MRA [QS] | APMP GA 18-6 | APMP EC 20-2 |
APMP_GA_18-8-2 Memorandum of Understanding of APMP [APMP] | APMP GA 18-8-2 |
APMP-QS1 Questionnaire QS1 (Rev on 4 April 2003) | APMP-QS1 |
APMP-QS2 APMP GUIDELINES FOR ACCEPTING A QUALITY SYSTEM (Rev on 4 April 2003) | APMP-QS2 |
APMP-QS3 TCQS Reviewer's Report | APMP-QS3 |
APMP-QS4 APMP QS Review Process | APMP-QS41 |
APMP-QS5 APMP QS review flowchart | APMP-QS5 |
APMP-S-20020720 .doc of APMP Bulletin Board System (BBS) Operation Manual | TCEM Bulletin 46 | APMP-S-20020720 |
APMP-S-20020721 .doc of APMP WEBSITE Files Uploading System (File Server) Operation Manual | TCEM Bulletin 46 | APMP-S-20020721 |
APMP-S-20021027 APMP comparison identification number nomenclature | DOC20030108H | APMP-S-20021027 |
APMP-TCC1-2 APMP Review Process Flowchart (Original 8th JCRB) | APMP-TCC1-2 |
APMP-TR-TC Terms of Reference of APMP-TCs [APMP-TCs] 20021115C | APMP-TR-TC |
CCEM00_EN Minutes of CCEM 22nd Meeting (September 2000) in English | CCEM00_EN |
CCEM02_EN Minutes of CCEM 23rd Meeting (September 2002) in English | CCEM02_GTRF03 | CCEM02_WGLF03 | WGLF/03-rCCEM02 | CCEM02_EN |
CIPM-2004-6 CIPM MRA: RESOLVING INCONSISTENCIES | JCRB-13/09(1) | CIPM-2004-6 |
CIPM-2004-7 NMIs AND OTHER DESIGNATED INSTITUTES | JCRB-13/09(2) rev.1 | CIPM 2004-7 |
CIPM-2004-8 Subcontracting of measurements under the CIPM MRA | JCRB-13/09(3) | CIPM-2004-8 |
CIPM-2004-9 Guidelines for the Acceptance of Certified Reference Materials in Appendix C of the CIPM Mutual Recognition Arrangement | JCRB-13/09(4) | CIPM 2004-9 |
DateOfMeetings List of Date of Past Meetings
DOC19990301B Nomenclature of the key (and suplementary) comparisons (and pilot studies) 19990301B | JCRB | 1999-03-01 |
DOC19990301C Checklist : Writing Comparison Protocol
DOC19990906 List of existing documents : Guides to comparisons
DOC20000428 Key comparison reference values - An explanatory note- by T.J. Quinn .htm .doc | DOC20000428 | kvrv2 |
DOC20001210 [replaced by | TCChairs_1-2/2 | APMP-G1_v2 |] APMP Procedure for CMC entry in Appendix C | DOC20001210 | APMP EC 22-2 | APMP G1 |
DOC20020720 APMP Guidelines for acceptance of data for Appendix C DOC20020720 | APMP-G3 | APMP EC 22-1 |
DOC20020914 memo: on CCEM treatment of past, ongoing, and planned APMP comparisons entry into KCDB 20020914
DOC20021111 TCEM 5th Meeting Attendance list
DOC20021115 Memorandum of Understanding of APMP [APMP] | APMP GA 18-8-2 |
DOC20021115A Attachment 1 to the MoU of APMP | APMP GA 18-8-2 |
DOC20021115B Attachment 2 to the MoU of APMP | APMP GA 18-8-2 |
DOC20021115C Terms of Reference of APMP-TCs [APMP-TCs] 20021115C | APMP-TR-TC |
DOC20021227 Report on TCEM 5th (2002-11 Hanoi)
DOC20030108 Library on International Comparisons 20030108
DOC20030108A CIPM KC flow chart | TCEM 5-13 |
DOC20030108B RMO KC flow chart | TCEM 5-13 |
DOC20030108C RMO SC flow chart | TCEM 5-13 |
DOC20030108D Proposal for the treatment of RMO Key comparisons by CCEM | TCEM 5-23 | CCEM WGKC/2002-36 |
DOC20030108E DECLARATION Form and PROGRESS REPORT Form | TCEM 5-22 | CCEM WGKC/2002-34 |
DOC20030108F memo: on rules of numbering comparisons 20030108F
DOC20030108G Questions and Answers on comparisons 20030108G
DOC20030108H APMP comparison identification number nomenclature 20030108H | APMP-S-20021027 |
DOC20030120A cover letter to invoke discussion on "APMP criteria for accepting a quality system"
DOC20030120B .html the body of "APMP criteria for accepting a quality system"
DOC20030120C .doc the body of "APMP criteria for accepting a quality system"
DOC20030224 EM Service Classification conversion table v 6 --> v 7.2 | DOC10030224 |
DOC20030304A CMC Template (Excel book) | DOC20030304A |
DOC20030304B APMP Electricity and Magnetism Supplement Guide to the JCRB Instructions for Appendix C of MRA | DOC20030304B |
DOC20030304C TCEM Guidelines for the Review of Calibration and Measurement Capabilities Submitted by other RMOs for Appendix C of the CIPM MRA (1st Draft) | DOC20030304C |
DOC20030313 Questions and Answers on CMC | DOC20030313 |
DOC20030728A TCEM Guidelines for the Review of Calibration and Measurement Capabilities Submitted by other RMOs for Appendix C of the CIPM MRA (2nd Draft) | DOC20030728A |
DOC20031025 Status Report of TCEM to the 19th APMP General Assembly (Dec. 2003)
DOC20031027 Provisional Agenda ver.2 of the TCEM 6th Meeting (Dec. 2003)
DOC20031106 ISO 3166 code-->State or Economy name
DOC20031112 Table for planning linkage to KCRV
DOC20040908A Comparison Report of P1-APMP.EM.RF-S4 (11.1.3 Calibration factor for a thermistor mount power sensor.)
DOC20040908B Comparison Protocol of P1-APMP.EM.RF-S4 (11.1.3 Calibration factor for a thermistor mount power sensor.)
DOC20040908C Comparison Protocol of P2-APMP.EM-S6 (Resistance, bilateral between NIMT_TH and NML_AU)
DOC20040915A Comparison Report of P2-APMP.EM-S6 (Resistance, bilateral between NIMT_TH and NML_AU)
DOC20040916A Comparison Report of P1-APMP.EM.BIPM-K11.1 (DCV 1.018 V, 10V; bilateral between SCL_HK and NML_AU)ver.4
DOC20040916B Comparison Summary of P1-APMP.EM.BIPM-K11.1 (DCV 1.018 V, 10V; bilateral between SCL_HK and NML_AU)
DOC20040916C Comparison Protocol of P1-APMP.EM.BIPM-K11.1 (DCV 1.018 V, 10V; bilateral between SCL_HK and NML_AU)
DOC20040916D [template] Declaration of a CCEM or RMO compariso (DF)
DOC20040916E [template] Progress report on CCEM or RMO comparison
DOC20040917A Comparison Protocol of P2-APMP.EM-S8 (Lighting Impulse Voltage; bilateral between NMIA_AU and NIT_JP)
DOCAPMPKC0 [obsolete] APMP Key Comparison progress monitor sheet (template)
DOCAPMPSC0 [obsolete] APMP Supplementary Comparison progress monitor sheet (template)
DOCAPMPKSC2 template of APMP comparisons progress monitor sheet
DOCEM_BIPM-K11_1 progress monitor sheet of [P1-APMP.EM.BIPM-K11.1]
DOCEM_RF-S3 progress monitor sheet of [P1-APMP.EM.RF-S3]
DOCEM_RF-S4 progress monitor sheet of [P1-APMP.EM.RF-S4]
DOCEM-K6_a progress monitor sheet of [P1-APMP.EM-K6.a]
DOCEM-K4-P2 progress monitor sheet of [P2-APMP.EM-K4] and [P1-APMP.EM-S6]
DOCEM-S8-S2 progress monitor sheet of [P2-APMP.EM-S8]
E-G08-v02_2 pdf of Euromet Guide No. 8 : Review Criteria and Procedures for EUROMET CMCs | EUROMET Guide No. 8 | E-G08-v02_2 |
E-G09-v01_2 pdf of Euromet
Guide No. 9 : EUROMET Review Procedure for other RMOs' CMC
s | EUROMET Guide No. 9 |
E-G09-v01_2 |
GTRF-2003-00 convocation and draft agenda 17th GT-RF, BIPM | GT-RF/03-00 |
GTRF-2003-01 [draft for comments] CCEM Guidelines for Planning, Organizing and Conducting Key, Supplementary and Pilot Comparisons, H.Bachmair, PTB | RMOEM_2003-03 | GT-RF/03-01 | WGLF/03-01, WGLF/03-01-A1, WGLF/03-01-A2, WGLF/03-01-A3, WGLF/03-01-A4, WGLF/03-01-A5, WGLF/03-01-A6, WGLF/03-01-A7 |
GTRF-2003-02 GT-RF Chairman's Report, October 2003, J.Randa, NIST | GT-RF/03-02 |
GTRF-2003-03 Draft B Report CCEM.RF-K8, J. de Vreede, NMi-VSL | GT-RF/03-03 |
GTRF-2003-04 Guidance for interpreting the Excel sheet Eur-633-v8.xls, J. de Vreede, NMi-VSL | GT-RF/03-04 |
GTRF-2003-05 Suggestion for GT-RF Procedures for Approval of Draft B Reports for Key Comparisons, J. Randa, NIST | GT-RF/03-05 |
GTRF-2003-06 Declaration Form CCEM.RF-S1.CL, J. Randa, NIST | GT-RF/03-06 |
GTRF-2003-07 Progress Report CCEM.RF-K10.CL, U. Stumper, PTB | GT-RF/03-07 |
GTRF-2003-08 Status Report CCEM.RF-K20, K. Hilty, METAS | GT-RF/03-08 |
GTRF-2003-09 Status Report Euromet.EM.RF-S16, K. Hilty, METAS | GT-RF/03-09 |
GTRF-2003-10 Status Report CCEM.RF-K20, K. Hilty, METAS | GT-RF/03-10 |
GTRF-2003-11 Euromet.EM.RF-S16 Analysis of Annex data, K. Hilty, METAS | GT-RF/03-11 |
GTRF-2003-12 Report from NPL on RF and Microwave Activities as of 14 October 2003, R. Clarke, NPL | GT-RF/03-12 |
GTRF-2003-13 PROGRESS REPORT ON EUROMET.EM.RF-K10.CL, D. Janik, PTB | GT-RF/03-13 |
GTRF-2003-14 Status report on CCEM.RF-K8.CL, J. de Vreede, NMi-VSL | GT-RF/03-14 |
GTRF-2003-15 Status report on CCEM.RF-K4.CL, J. de Vreede, NMi-VSL | GT-RF/03-15 |
GTRF-2003-16 Report to CCEM-WGLF & -GT-RF on RMO Comparisons of APMP-TCEM. November 2003, Y. Sakamoto, AIST | GT-RF/03-16 | WGLF-2003-13 |
GTRF-2003-17 Report on CCEM.RF-K1.d.W, R. Clarke, NPL | GT-RF/03-17 |
GTRF02_GTF03 Report on the CCEM Working Group on Radiofrequency Quantities (10 Sept. 2002) J. Randa, NIST | GT-RF/03-rGTRF02 |
JCRB-Index Index of Restricted JCRB Meeting Documents
JCRB-3_report Report of the third meeting of the JCRB (1999-07-15, North Carolina) | JCRB-3_report |
JCRB-7/1_1 JCRB Rules of Procedure for CMC (first) entry into Appendix C | JCRB-13/06 | APMP TCChairs 1-2/6 | APMP EC 22-4 | TCEM 5-5 | APMP G1 | JCRB-7/1 |
JCRB-7/1_2 * [Established] Criteria for acceptance of data for Appendix C | JCRB-13/06(2) | APMP TCChairs 1-2/5 | APMP EC 22-3 | TCEM 5-5 | APMP G1 | JCRB-8/13(1b) | JCRB-7/1 #2|
JCRB-7/1_3 * Procedure for inter-regional review of CMCs | TCEM 5-5 | APMP G1 | JCRB-7/1 #3|
JCRB-8/7(3) Draft-for-discussion : APMP position paper on requirements for CMCs from developing NMIs | TCEM 5-15 | JCRB-8/7(3) |
JCRB-8/10 Procedure for modifying CMCs already in Appendix C | TCEM 5-6 | JCRB-8/10 |
JCRB-8/13(1b) * [Established] Criteria for acceptance of data for Appendix C | JCRB-13/06(2) | APMP TCChairs 1-2/5 | APMP EC 22-3 | TCEM 5-5 | APMP G1 | JCRB-8/13(1b) | JCRB-7/1 #2|
JCRB-8/19(c) rev Flowchart of Supplementary Comparison Process | RMOEM_2003-05 | JCRB-8/19(c) rev |
JCRB-8/20 JCRB CMC review process flowchart | TCEM 5-14 | JCRB-8/20 |
JCRB-10/6(3) Working Groups on CMCs | RMOEM_2003-08 | JCRB-10/6(3) | JCRB-9/8(4_rev) |
JCRB-10/7_rev A Note on Supplementary comparisons | JCRB-10/7_rev |
JCRB-10/8(1c) JCRB Guidelines for the monitoring and reporting of the operation Quality Systems by RMOs | RMOEM_2003-11 | JCRB-10/8(1c) |
JCRB-11_02(a) Flowchart of the key comparison process | JCRB-11/2(a) |
JCRB-11/7 End of Transition Period of CIPM MRA - Review of published CMCs | RMOEM_2003-09 |JCRB-11/7 |
JCRB-11/7(a) Proposed JCRB Recommendation re: Monitoring the Impact of Key and Supplementary Comparison Results on CMC Claims | RMOEM_2003-06 | JCRB-11/7(a) |
JCRB-11/7(b) APMP Proposal | RMOEM_2003-12 | JCRB-11/7(b) |
JCRB-11/8(3a) Proposed JCRB statement | RMOEM_2003-10 | JCRB-11/8(3a) |
JCRB-11/8(5) Supplementary comparisons - definitions | RMOEM_2003-04 | JCRB-11/8(5) |
JCRB-11-Act27 JCRB Recommendations for on-site visits by peers and selection criteria for those peers | JCRB-11/Action27 | JCRB-13/xxx |
JCRB-12_06(2) JCRB Procedure for specifying the scope of CMCs | JCRB-12_06(2) |
JCRB-13/02 Matters arising from the report of the 12th meeting held at the CENAM
JCRB-13/04 Report on the present status of the KCDB
JCRB-13/04(1) Bilateral key comparison flowchart | JCRB-13/04(1) |
JCRB-13/06 [Revised] JCRB Rules of Procedure for CMC entry into Appendix C | JCRB-13/06 | APMP TCChairs 1-2/6 | APMP EC 22-4 | TCEM 5-5 | APMP G1 | JCRB-7/1 |
JCRB-13/06(2) * [Established] [Revised] Criteria for acceptance of data for Appendix C | JCRB-13/06(2) | APMP TCChairs 1-2/5 | APMP EC 22-3 | TCEM 5-5 | APMP G1 | JCRB-8/13(1b) | JCRB-7/1 #2|
JCRB-13/09(1) CIPM MRA: RESOLVING INCONSISTENCIES | JCRB-13/09(1) | CIPM-2004-6 |
JCRB-13/09(2) rev.1 NMIs AND OTHER DESIGNATED INSTITUTES | JCRB-13/09(2) rev.1 | CIPM 2004-7 |
JCRB-13/09(3) Subcontracting of measurements under the CIPM MRA | JCRB-13/09(3) | CIPM-2004-8 |
JCRB-13/09(4) Guidelines for the Acceptance of Certified Reference Materials in Appendix C of the CIPM Mutual Recognition Arrangement | JCRB-13/09(4) | CIPM-2004-9 |
JCRB-13/xxx JCRB Recommendations for on-site visits by peers and selection criteria for those peers | JCRB-11/Action27 | JCRB-13/xxx |
JCRB-13_report_to_APMP Agenda of the 13th JCRB meeting and actions to APMP related parties/members | JCRB-13_report_to_APMP |
MRA-Appendices Appendices to the MRA
MRA-AppendixE Terms of reference of the JCRB [JCRB]
MRA-AppendixF Guidelines for (CIPM key) comparisons | MRA- AppendixF | 1999-03-01 |
MRA-AppendixG Glossary of terms used in the MRA
MRA-essential The essential points of the MRA
MRA-Index Index and link : MRA (English version) [MRA]|MRA-Index |
MRA-MainText Main Text Body of the MRA
MRA-P-7 MRA Paragraph 7
MRA-P-11_3 MRA Pragraph 11.3
MRA-TechSuppl Technical supplement to the MRA
ProgCMC [restricted] Progress Monitor : CMC Claims, Reviews, Registrations | ProgCMC |
ProgComp APMP.EM comparison progress monitor
register_kc_sc2 Flowcharts of Comparison Procedures
RMOEM_2003-01 Draft agenda
RMOEM_2003-02 3rd RMO EM TC meeting actions (Oct 2002)
RMOEM_2003-03 [draft for comments] CCEM Guidelines for Planning, Organizing and Conducting Key, Supplementary and Pilot Comparisons, H.Bachmair, PTB | RMOEM_2003-03 | GT-RF/03-01 | WGLF/03-01, WGLF/03-01-A1, WGLF/03-01-A2, WGLF/03-01-A3, WGLF/03-01-A4, WGLF/03-01-A5, WGLF/03-01-A6, WGLF/03-01-A7 |
RMOEM_2003-04 Supplementary comparisons - definitions | RMOEM_2003-04 | JCRB-11/8(5) |
RMOEM_2003-05 Flowchart of Supplementary Comparison Process | RMOEM_2003-05 | JCRB-8/19(c) rev |
RMOEM_2003-06 Proposed JCRB Recommendation re: Monitoring the Impact of Key and Supplementary Comparison Results on CMC Claims | RMOEM_2003-06 | JCRB-11/7(a) |
RMOEM_2003-07 EUROMET Proposal for a procedure to check the currently published CMCs against the results of a key comparison | RMOEM_2003-07 |
RMOEM_2003-08 Consultative Committee Working Groups on CMCs | RMOEM_2003-08 | JCRB-10/6(3) rev |
RMOEM_2003-09 End of Transition Period of CIPM MRA - Review of published CMCs | RMOEM_2003-09 | JCRB-11/7 |
RMOEM_2003-10 Proposed JCRB statement | RMOEM_2003-10 | JCRB-11/8(3a) |
RMOEM_2003-11 JCRB Guidelines for the monitoring and reporting of the operation Quality Systems by RMOs | RMOEM_2003-11 | JCRB-10/8(1c) |
RMOEM_2003-12 APMP Proposal | RMOEM_2003-12 | JCRB-11/7(b) |
ServiceClassV6 Service Classification v.6 [EM] in pdf (until 2003-05-15)
TCEM_B_Index TCEM Bulletin Index
TCEM_B_53 TCEM Bulletin 53 : End of Dec is deadline for new entry to CMC
TCEM_B_56 TCEM Bulletin 56 : Monthly report 2003-01 (January 2003)
TCEM_B_57 TCEM Bulletin 57 : on CCEM treatment of past, ongoing, and planned APMP comparisons entry into KCDB
TCEM_B_58 TCEM Bulletin 58 : Latest Quality System Requirements & Questionnaire
TCEM_B_59 TCEM Bulletin 59 : EM Service Classification v 7.2 <-- v 6
TCEM_B_60 TCEM Bulletin 60 : Quick report on APMP-EC Meeting.
TCEM_B_61 TCEM Bulletin 61 : Quick report on JCRB 10th Meeting.
TCEM_B_62 TCEM Bulletin 62 : First call for CMC (deadline 2003-03-21).
TCEM_B_62b TCEM reminder of Bulletin 62 (deadline2003-03-21).
TCEM_B_63 TCEM Bulletin 63 : Second call for CMC (deadline 2003-04-28) + On review board
TCEM_B_64 TCEM Bulletin 64 : Report on TC Chairs 1st Meeting (March 2003)
TCEM_B_65 TCEM Bulletin 65 : Two columns for "Comments" in CMC list.
TCEM_B_66 TCEM Bulletin 66 : Questionnaire - Technical peers in EM field.
TCEM_B_67b (Attached) letter from APMP Chairman
TCEM_B_67c (Attached) letter from Director of SPRING Singapore
TCEM_B_69 TCEM Bulletin 69 : December meetings website (hotel booking)
TCEM_B_70 TCEM Bulletin 70 : APMP Comparison of capacitance at 10 pF and 100 pF.
TCEM_B_71 TCEM Bulletin 71 : Agenda of December meeting in Singapore
TCEM_B_72 TCEM Bulletin 72 : Status Report of TCEM to the 19th APMP General Assembly (Dec. 2003)
TCEM_B_75 TCEM Bulletin 75 : TCEM 7th to be held on 18 and 19 October in Beijing
TCEM_B_76 TCEM Bulletin 76: New CCEM Guidelines for Comparisons
TCEM_B_79 TCEM Bulletin 79: TCEM report to APMP TC Chairs meeting
TCEM_B_99 TCEM Bulletin 99: Matters arising from TCEM 7th Meeting / New TCEM Chair
TCEM_4-13 introduction to TCEM Guide on Conducting Comparisons | TCEM 4-13 |
TCEM_4-13_PDF the body of TCEM Guide on Conducting Comparisons in pdf | TCEM 4-13 |
TCEM 5-0 TCEM members list
TCEM 5-1 TCEM report to APMP-GA 18th (2002-11 Hanoi)
TCEM 5-2 Minutes of 4th TCEM meeting
TCEM_5-3 Summary of issues discussed and corresponding actions to taken - 2nd Draft | TCEM 5-3 | Third meeting of RMO EM TC Chairs (2002-09-09 @ BIPM) )
TCEM_5-4 pdf of Year 2002 review report on the CMC by APMP-TCEM Chair Chua-san | TCEM 5-4 | Original submission to JCRB (2002-09-23))
TCEM_5-5 JCRB Rules of Procedure for CMC (first) entry into Appendix C | JCRB-13/06 | APMP TCChairs 1-2/6 | APMP EC 22-4 | TCEM 5-5 | APMP G1 | JCRB-7/1 |
TCEM_5-5_2 * [Established] Criteria for acceptance of data for Appendix C | JCRB-13/06(2) | APMP TCChairs 1-2/5 | APMP EC 22-3 | TCEM 5-5 | APMP G1 | JCRB-8/13(1b) | JCRB-7/1 #2|
TCEM_5-5_3 * Procedure for inter-regional review of CMCs | TCEM 5-5 | JCRB-7/1 #3|
TCEM_5-6 Procedure for modifying CMCs already in Appendix C | TCEM 5-6 | JCRB-8/10 |
TCEM_5-7 BIPM instructions for drawing up CMC EXCEL files | TCEM 5-7 | WGLF/02-25 | CCEM WGKC/2002-25 | JCRB-6/? | 2001-03-08 |
TCEM_5-7_Section_1 text
TCEM_5-7_Section_2 table
TCEM_5-8 Additional instructions for CMCs files in EM | TCEM 5-8 | WGLF/02-22 | CCEM WGKC/2002-22 |
TCEM_5-9 Instructions for closely related CMCs htm xls | TCEM 5-9 | WGLF/02-24 | CCEM WGKC/2002-24 |
TCEM_5-10 Instruction for uncertainty matrices in CMC files htm xls | TCEM 5-10 | WGLF/02-23 | CCEM WGKC/2002-23 | ADDITIONAL INSTRUCTIONS FOR CMCs FILES IN EM, C.Thomas, BIPM
TCEM 5-11 8th JCRB minutes
TCEM 5-12 Definition of terms used in the CIPM MRA
TCEM_5-13 CIPM KC flow chart RMO KC flow chart RMO SC flow chart ; three flowcharts in one book | TCEM 5-13 | DOC20030108A,B,C | register_kc_sc2 |
TCEM_5-14 JCRB CMC review process flowchart | TCEM 5-14 | JCRB-8/20 |
TCEM_5-15 Draft-for-discussion : APMP position paper on requirements for CMCs from developing NMIs | TCEM 5-15 | JCRB-8/7(3) |
TCEM_5-16 Service Classification v7.2 [EM] | TCEM 5-16 | CCEM WGKC/2002-21 |
TCEM 5-17 CCEM comparison of nonsinusoidal calibration systems
TCEM_5-18 Proposal for a revised scheme for DC&LF and RF Key Comparisons | TCEM 5-18 | CCEM WGKC/2002-07 | GTRF/2002-09 |
TCEM 5-19 Proposal for a CCEM Key Comparison on Current Ac-dc Transfer
TCEM_5-20 pdf of A proposal about the names of Regional Key Comparisons | TCEM 5-20 | CCEM WGKC/2002-31 | 2002-09-10 |
TCEM 5-21 Appendix
B
A and non member
TCEM_5-22 DECLARATION Form and PROGRESS REPORT Form .doc .html| TCEM 5-22 | CCEM WGKC/2002-34 |
TCEM_5-23 Proposal for the treatment of RMO Key comparisons by CCEM .doc .html | DOC20030108D | TCEM 5-23 | CCEM WGKC/2002-36 |
TCEM 5-24 TCEM comparisons list
TCEM 5-25 APMP 3rd DC voltage comparison final report
TCEM 5-26 APMP AC-DC transfer comparison status report
TCEM 6-10 [draft for comments] CCEM Guidelines for Planning, Organizing and Conducting Key, Supplementary and Pilot Comparisons, H. Bachmair, PTB | TCEM 6-10 | part of RMOEM_2003-03 | part of GT-RF/03-01 | WGLF/03-01 |
TCQS-WG1_1 Quality
System Questionnaire QS1
(draft 2003-01-31)
| APMP EC 22-7 | TCQS-WG1_1 |
TJWEMCP01 ppt of Remarks on uncertainty calculations for key comparisons with a few examples from CCEM key comparisons | TJWEMCP01 |
WGKC02_WGLF03 Report of the CCEM Working Group on Key Comparisons (11-12 September 2002), B. Jeckelmann, METAS | WGLF/03-rWGKC02 |
WGKC2000-08 Method for comparing CCEM and RMO inter-comparisons Submitted to CCEM 21/8/00 S. P. Giblin bCCEM WGKC/2000-08 | WGKC Sep00-8 | WGKC/00-08 |
WGKC2000-14 On the analysis and linking of comaprison results by D R White, L A Christian, K Jones and P SaundersbCCEM WGKC/2000-14 | WGKC Sep00-14 | WGKC/00-14 |
WGKC2000-21 Draft: CIPM key comparison CCEM.RF-K10CL (GT-RF/99-2) "Power in the coaxial PC 3,5 mm line system" Technical protocol by D. JanikbCCEM WGKC/2000-21 | WGKC Sep00-21 | WGKC/00-21 |
WGKC2001-01 pdf of Guidance for the publication of the results of key comparisons | CCEM WGKC/2001-01 | GT-RF/01-09 | CCQM/01-01 |
WGKC2001-02 CCEM-K2 key comparison of resistance standards at 10 M and 1 G, R.F. Dziuba, NIST WORD 301 kbytes | WGLF/01-02 |
WGKC2001-03 CCEM-K10 key comparison "100 standard resistor", B. Schumacher, PTB WORD 67 kbytes | WGLF/01-03 |
WGKC2001-04 CCEM. M-K1 key comparison "Magnetic flux density by means of a transfer standard coil", K. Weyand, PTB WORD 3304 kbytes | WGLF/01-04 |
WGKC2001-05 CCEM-K11 key comparison ? AC-DC voltage transfer difference at low voltages, K.-E. Rydler, SP WORD 62 kbytes | WGLF/01-05 |
WGKC2001-06 Proposal of a simplified approach to the analysis of uncertainties in key comparisons, T.J. Witt, BIPM WORD 23 kbytes | CCEM WGKC/2001-06 | WGLF/01-06 |
WGKC2001-07 CCEM key comparison on ac voltage ratio CCEM-K7: progress and present status: May 2001, I.A. Robinson, NPL WORD 27 kbytes | WGLF/01-07 |
WGKC2001-08 Status report on CCEM-K6c, J.P.M. de Vreede, NMi WORD 19 kbytes | WGLF/01-08 |
WGKC2001-09 pdf of Comparison of measurement values in the presence of low-frequency noise | CCEM WGKC/2001-09 |
WGKC2001-10 a precise bridge for QHR standard in NIM and Mutual comparison of resistance standard between NIM and ETL, Z. Zhang et al PDF 376 kbytes | WGLF/01-10 |
WGKC2001-11 progress report comparisons CCEM-K8 and EUROMET 449, G. Marullo-Reedtz WORD 30 kbytes | WGLF/01-11 |
WGKC2001-12 EUROMET electricity and magnetism comparison projects, G. Marullo-Reedtz EXCEL 58 kbytes | WGLF/01-12 |
WGKC2001-13 CCEM-K5 comparison of 50/60 Hz power, N.Oldhan, T.Nelson WORD 935 kbytes | WGLF/01-13 |
WGKC2001-14 continuation of CCEM-K5; appendices C and D, N.Oldhan, T.Nelson WORD 210 kbytes | WGLF/01-14 |
WGKC2001-15 international comparison of 10 mH inductance standards at 1 kHz, H.Eckart WORD 990 kbytes | WGLF/01-15 |
WGKC2001-16 pdf of Comments about the BIPM proposal for linking CCEM-K4 and EUROMET 345 | CCEM WGKC/2001-16 |
WGKC2001-17 pdf of General linking methodology with application to CCEM-K4 and EUROMET Project 345 | CCEM WGKC/2001-17 |
WGKC2001-18 report of the 4th meeting of the CCEM working group on key comparisons (13-14 September 2000), B.Wood and CCEM WGKC WORD 71 kbytes | WGLF/01-18 |
WGKC2001-19 pdf of A proposal for linking the results of Key Comparison CCEM-K4 with the 10-pF results of EUROMET Project 345 | CCEM WGKC/2001-19 |
WGKC2001-20 A reviewer?s proposals for completing the analysis of values and uncertainties of CCEM-K6.a, T.J. Witt WORD 25 kbytes | WGLF/01-20 |
WGKC2001-21 pdf of Example of an Appendix B entry for results obtained over a range of parameters, CCM.P-K1c | CCEM WGKC/2001-21 | GT-RF/01-18 |
WGKC2001-22 Key comparison reference value, degree of equivalence – Where do we stand? | CCEM WGKC/2001-22 |
WGKC2001-23 Draft B CCEM-K5 comparison of 50/60 Hz power (revised), N. Oldham WORD 1137 kbytes | WGLF/01-23 |
WGKC2001-24 CCEM-K5 comparison of 50/60 Hz power (Draft B1), N. Oldham WORD 86 kbytes | WGLF/01-24 |
WGKC2001-25 Some statistical formulas used in the analysis of key comparisons, version 1.0, T.J. Witt PDF 30 kbytes | WGLF/01-25 |
WGKC2001-26 document not available in electronic form | WGLF/01-26 |
WGKC2001-27 Actions list WGKC 2001, T.J. Witt WORD 34 kbytes | WGLF/01-27 |
WGKC2001-28 A detailed proposal for a CCEM key comparison of magnetic flux density in the geomagnetic range, V. Shifrin WORD 47 kbytes | WGLF/01-28 |
WGKC2002-01 A proposal for BIPM on-going comparisons of 10 pF and 100 pF capacitance standards, F.Delahaye, BIPM WORD 45 kbytes| WGLF/02-01 |
WGKC2002-02 Erratum for the Final Report of CCEM-K2 Key Comparisons, D. Jarrett, NIST WORD 124 kbytes | WGLF/02-02 |
WGKC2002-03 Draft B Report CCEM-K8 Comparison of dc voltage ratio, G. Marullo Reedtz, IEN WORD 2109 kbytes | WGLF/02-03 |
WGKC2002-04 APMP TECHNICAL COMMITTEE ON ELECTRICITY AND MAGNETISM COMPARISONS Summary 10 August 02 S.W. Chua, SPRING 2002/08/27 EXCEL 78 kbytes an EXCEL book on renumbering APMP-TCEM comparisons CThomas_19Sep02 (29 Nov 2002)2
WGKC2002-05 Draft B Report CCEM-K8 Comparison of dc voltage ratio, G. Marullo Reedtz, IEN WORD 2109 kbytes | WGLF/02-05 |
WGKC2002-06 Statistical uncertainty analysis for key comparison CCEM-K2 | CCEM WGKC/2002-06 | WGLF/02-06(2) Statistical Uncertainty Analysis of Key Comparison CCEM-K2 (revised 29 October 2002), N.-F. Zhang, NIST 2002/10/29 WORD 264 kbytes
WGKC2002-07 Proposal for a revised scheme for DC&LF and RF Key Comparisons, H. Bachmair, PTB WORD 51 kbytes | WGLF/02-07 |
WGKC2002-08 A proposal for a CCEM Key Comparison on Current Ac-dc Transfer, I. Budovsky, CSIRO-NML WORD 26 kbytes | WGLF/02-08 |
WGKC2002-09 Letter to BIPM Director (participation in key comparisons), H. Bachmair, PTB WORD 32 kbytes | WGLF/02-09 |
WGKC2002-10 Participation in key comparisons (response to letter of H.Bachmair), T.J.Quinn, BIPM WORD 20 kbytes | WGLF/02-10 |
WGKC2002-11 SUBMISSION OF DRAFT B FINAL REPORT OF EUROMET.EM-S6 TO THE WGKC OF THE CCEM FOR APPROVAL, G. Marullo-Reedtz, IEN WORD 25 kbytes | WGLF/02-11 |
WGKC2002-12 EUROMET ELECTRICITY AND MAGNETISM CURRENT COMPARISON PROJECTS, G. Marullo-Reedtz, IEN EXCEL 46 kbytes | WGLF/02-12 |
WGKC2002-13 Some recommendations for easing the pilot labs workload and speeding up key comparisons, D. Jarrett, NIST WORD 20 kbytes | WGLF/02-13 |
WGKC2002-14 EUROMET Comparison of AC Electric Field Strength EUROMET EM-S6 Draft B report H. Eckardt, PTB WORD 1404 kbytes | WGLF/02-14 |
WGKC2002-15 Long-Range View of CCEM Key Comparisons, W.E. Anderson, NIST WORD 24 kbytes | WGLF/02-15 |
WGKC2002-16 Status report on CCEM-K6c, J.P.M. de Vreede, NMi/VSL WORD 20 kbytes | WGLF/02-16 |
WGKC2002-17 Report of the 5th Meeting of the CCEM Working Group on Key Comparisons (27-28 June 2001), B.M. Wood, NRC WORD 127 kbytes | WGLF/02-17 |
WGKC2002-18 Updated summary of actions from the 27-28 June 2001 meeting of the CCEM Working Group on Key Comparisons (WGKC), T.J. Witt, BIPM WORD 37 kbytes | WGLF/02-18 |
WGKC2002-19 (Draft protocol of a) COMPARISON OF NONSINUSOIDAL CALIBRATION SYSTEMS, E. So, NRC WORD 26 kbytes | WGLF/02-19 |
WGKC2002-20 Correspondence P.Wright/E.So re: Nonsinusoidal Power comparison, E.So, NRC WORD 31 kbytes | WGLF/02-20 |
WGKC2002-21 Service Classification v7.2 [EM] | TCEM 5-16 | CCEM WGKC/2002-21 | Classification of Electricity and Magnetism Calibration and Measurement Capabilities (Version 7.2, revised 15 March 2002) H.Bachmair, PTB EXCEL 63 kbytes
WGKC2002-22 Additional instructions for CMCs files in EM | TCEM 5-8 | WGLF/02-22 | CCEM WGKC/2002-22 |
WGKC2002-23 Instruction for uncertainty matrices in CMC files htm xls | TCEM 5-10 | WGLF/02-23 | CCEM WGKC/2002-23 | ADDITIONAL INSTRUCTIONS FOR CMCs FILES IN EM, C.Thomas, BIPM
WGKC2002-24 Instructions for closely related CMCs htm xls | TCEM 5-9 | WGLF/02-24 | CCEM WGKC/2002-24 | BIPM Instructions for closely related CMCs, C.Thomas, BIPM
WGKC2002-25 BIPM instructions for drawing up CMC EXCEL files | TCEM 5-7 | WGLF/02-25 | CCEM WGKC/2002-25 | JCRB-6/? | 2001-03-08 |
WGKC2002-26 Revised Draft Agenda of the 6th meeting of the CCEM Working Group on Key Comparisons, H.Bachmair, PTB WORD 22 kbytes | WGLF/02-26 | CCEM WGKC/2002-26 |
WGKC2002-27 [draft for disucussion] Proposed guidelines for the evaluation of key comparison data, W.Bich, IMGC PDF 145 kbytes | WGLF/02-27 | CCEM WGKC/2002-27 | GT-RF/02-13 |
WGKC2002-28 Status report on CCEM-K11 "ac-dc voltage transfer difference at low voltages", K.-E.Rydler, SP WORD 41 kbytes | WGLF/02-28 | CCEM WGKC/2002-28 |
WGKC2002-29 CCEM Key Comparison on ac voltage ratio CCEM-K7: Progress and present status: August 2002, I.Robinson, NPL PDF 70 kbytes | WGLF/02-29 | CCEM WGKC/2002-29 |
WGKC2002-30 CCEM-K5 Comparison of 50/60 Hz Power Draft B, N. Oldham, NIST WORD 593 kbytes | WGLF/02-30 | CCEM WGKC/2002-30 |
WGKC2002-31 A proposal about the names of Regional Key Comparisons, G.Marullo Reedtz WORD 28 kbytes | WGLF/02-31 | CCEM WGKC/2002-31 |
WGKC2002-32 Some considerations about including matrices of degrees of equivalence in key comparison reports, T.J.Witt, BIPM WORD 22 kbytes | WGLF/02-32 | CCEM WGKC/2002-32 |
WGKC2002-33 Revised Draft Agenda of the 6th meeting of the CCEM Working Group on Key Comparisons, H.Bachmair, PTB WORD 22 kbytes | WGLF/02-33 | CCEM WGKC/2002-33 |
WGKC2002-34 DECLARATION Form and PROGRESS REPORT Form .doc .html | part of RMOEM_2003-03 | part of GT-RF/03-01 | WGLF/03-01-A2 | TCEM 5-22 | CCEM WGKC/2002-34 |
WGKC2002-35 SIM Comparison Activities, H.Sanchez, SIM WORD 24 kbytes | WGLF/02-33 | CCEM WGKC/2002-335 |
WGKC2002-36 Proposal for the treatment of RMO Key comparisons by CCEM .doc .html | TCEM 5-23 | CCEM WGKC/2002-36 | Modified proposal for the treatment of RMO key comparisons by the CCEM, G. Marullo Reedtz, IEN WORD 19 kbytes
WGLF-2003-00 WGLF convocation and draft agenda, T.J.Quinn & H. Bachmair PDF 125 kbytes | WGLF/03-00 |
WGLF-2003-01 [draft for comments] CCEM Guidelines for Planning, Organizing and Conducting Key, Supplementary and Pilot Comparisons, H. Bachmair, PTB | TCEM 6-10 | part of RMOEM_2003-03 | part of GT-RF/03-01 | WGLF/03-01 |
WGLF-2003-01-A1 [draft for comments] CCEM Guidelines Annex 1 (Flow chart), H. Bachmair, PTB | part of RMOEM_2003-03 | part of GT-RF/03-01 | WGLF/03-01-A1 |
WGLF-2003-01-A2 [draft for comments] CCEM Guidelines Annex 2 (Declaration form), H. Bachmair, PTB | part of RMOEM_2003-03 | part of GT-RF/03-01 | WGLF/03-01-A2 | TCEM 5-22 | CCEM WGKC/2002-34 |
WGLF-2003-01-A3 [draft for comments] CCEM Guidelines Annex 3 (Protocol), H. Bachmair, PTB | part of RMOEM_2003-03 | part of GT-RF/03-01 | WGLF/03-01-A3 |
WGLF-2003-01-A4 [draft for comments] CCEM Guidelines Annex 4 (Report), H. Bachmair, PTB | part of RMOEM_2003-03 | part of GT-RF/03-01 | WGLF/03-01-A4 |
WGLF-2003-01-A5 [draft for comments] CCEM Guidelines Annex 5 (KCDB), H. Bachmair, PTB | part of RMOEM_2003-03 | part of GT-RF/03-01 | WGLF/03-01-A5 |
WGLF-2003-01-A6 [draft for comments] CCEM Guidelines Annex 6 (Analysis), H. Bachmair, PTB | part of RMOEM_2003-03 | part of GT-RF/03-01 | WGLF/03-01-A6 |
WGLF-2003-01-A7 [draft for comments] CCEM Guidelines Annex 7 (Relevant documents), H. Bachmair, PTB | part of RMOEM_2003-03 | part of GT-RF/03-01 | WGLF/03-01-A7 |
WGLF-2003-02 Draft B Report EUROMET.EM-K8 Comparison of DC Voltage Ratio, G. Marullo Reedtz, IEN | WGLF/03-02 |
WGLF-2003-02-A1 Appendix A Draft B Report EUROMET.EM-K8 Comparison of DC Voltage Ratio, G. Marullo Reedtz, IEN | WGLF/03-02-A1 |
WGLF-2003-03 Linking the results of key comparisons CCEM-K8 and EUROMET.EM-K8, G. Marullo Reedtz, IEN | WGLF/03-03 |
WGLF-2003-04 EUROMET.EM-K8 progress report, G. Marullo Reedtz, IEN | WGLF/03-04 |
WGLF-2003-04-A Declaration of follow-up comparison CCEM-K8 (replaces WGLF/2003-04), G. Marullo Reedtz, IEN | WGLF/03-04-A |
WGLF-2003-05 CCEM.EM-K8 progress report, G. Marullo Reedtz, IEN | WGLF/03-05 |
WGLF-2003-06 Status Report CCEM-K7, I Robinson, NPL | WGLF/03-06 |
WGLF-2003-07 CCEM-k9 / EUROMET 557 COMPARISON OF AC-DC HIGH VOLTAGE STANDARDS, A. POLETAEFF, BNM | WGLF/03-07 |
WGLF-2003-08 CCEM Key Comparison of AC/DC Current Transfer Standards CCEM-K12, I. Budovsky, NML | WGLF/03-08 |
WGLF-2003-09 CCEM Key International Comparison of AC-DC Current Transfer Standards CCEM-K12 Technical Protocol, I. Budovsky, NML | WGLF/03-09 |
WGLF-2003-10 CCEM Key International Comparison of AC-DC Current Transfer Standards CCEM-K12 Application Form, I. Budovsky, NML | WGLF/03-10 |
WGLF-2003-11 Proposed Euromet Project: Magnetic flux density in the range of 0.2 T to 2 T, J. de Vreede, VSL | WGLF/03-11 |
WGLF-2003-12 CCEM-K6.c progress report, October 2003, E. Dierikx, VSL | WGLF/03-12 |
WGLF-2003-12-A Background and summary of key comparison CCEM-K6.c, E. Dierikx, VSL | WGLF/03-12-A |
WGLF-2003-12-B CCEM-K6.c calculations of the results Instruction on how to read the file "Lab-results-K6c-ED-031022.xls", E. Dierikx, VSL | WGLF/03-12-B |
WGLF-2003-13 Report to CCEM-WGLF & -GT-RF on RMO Comparisons of APMP-TCEM. November 2003, Y. Sakamoto, AIST | GTRF-2003-16 | WGLF/03-13 |
WGLF-2003-14 SIM Comparison Activities E&M MWG, H. Sanchez, ICE | WGLF/03-14 |
WGLF-2003-15 Declaration of follow-up of comparison EUROMET.EM-K8, G. Marullo Reedtz, IEN | WGLF/03-15 |
WGLF-2003-16 EM (ELECTRICITY AND MAGNETISM) AGREED COOMET PROJECTS, D. Vasiliev, VNIIFTRI | WGLF/03-16 |
WGLF-2003-17 Update on CCEM-K11 "ac-dc voltage transfer difference at low voltages", K-E Rydler, SP | WGLF/03-17 |
WGLF-2003-18 Case study: P1-APMP.BIPM.EM-K11.1 "Bilateral comparison on DC 10 V and 1.018 V between NML_AU and SCL_HK", Y. Sakamoto, AIST | WGLF/03-18 |
@
2004-10-26 | 2004-10-12 | 2004-05-14 | 2003-11-12 | 2003-10-27 | 2003-06-02 | 2003-04-19 |
2003-03-13 | 2003-02-26 | 2003-02-24 | 2003-02-21 | 2003-02-10 |
2003-02-03 | 2003-01-31 | 2003-01-29 | 2003-01-25
Some document titles listed above are
accompanied by document identifier(s). The document identifiers are printed in
faint gray color like this.
If you want to search a document from document identifier, and if your browser
has "search" function, you may activate the "search" menu
and type document identifier in, and start "search".
One document may be accompanied by more
than one document identifier. An example of such document is
Approximate date of submission of a document may be estimated from the date of the meeting that identifier suggests.
2003-02-21 | 2003-01-29 | 2003-01-27 | 2003-01-25link to Useful Document Library
This webpage is maintained by
sakamoto.yasuhiko@aist.go.jp
This set of APMP-TCEM webpage has been freezed as of 2004-10-31 (31 October 2004). For latest information, please visit APMP homepage or contact the new APMP-TCEM Chair Dr. Yang Sup SONG of KRISS_KR.